Facility 1 – The building at Berkshire Road consisted of a 7500m2 warehouse, 700m2 office and over 8000m2 of concrete hardstands. The contract included supply and installation of fire, electrical and hydraulic infrastructure to accommodate a further 3 buildings on the adjoining land.
The building was constructed from structural steel clad with precast panels and colourbond sheeting. The internal floor slabs and external hardstands were constructed using fibre reinforced concrete which significantly reduced the amount of construction joints required.
The fire services included the installation of a pump and tank system which was serviced by 3 in-ground bores. PS Structures were involved in the design of this unique fire system which through the use of bores alleviated the need for a second fire tank which in turn provided an increased amount of hardstand.
A private high voltage substation was also constructed as a part of the project which included the installation of new transformers and switchgear. This involved considerable liaison with Western Power to ensure that power was made available to the site in time for commissioning of the services.
The successful completion of the Facility 1 building resulted in the client awarding PS Structures the contracts to construct a further 3 buildings on the adjoining land.
Facility 2  – The 3rd unit onsite to be built and occupies 18, 273m2, comprising of:

  • Warehouse 7,400m2
  • Office 605m2
  • Awning 776m2
  • Concrete hardstand 7,639m2

Included are infrastructure works to the site such as:

  • Below ground stormwater infiltration tanks
  • Carapark for 100 cars.

Facility 3 – The 4th unit onsite to be built and occupies approximately 10,500m2, comprising of the following:

  • Warehouse 3,350m2
  • Office 180m2
  • Awning 200m2
  • Concrete hardstand 6,500m2

Included are infrastructure works to the site such as:

  • Below ground stormwater infiltration tanks.
  • Carapark with 43 bays.

Facility 4 – The second unit on the site to be built and occupies approximately 16 000m2, comprising the following:

  • Warehouse 3,350m2
  • Canopy 200m2
  • Office 200m2